Free printable checklist

Roofing supplement checklist

Check every insurance roof estimate against these 25 items before you start the job. Each one is commonly left off or short.

Quantities

  • Shingles = measured squares + waste10% gable, 15%+ hip or cut-up roofs; round up to the bundle
  • Tear-off = full measured areaNot the shingle quantity minus waste
  • Additional layer removalEvery layer beyond the first
  • Underlayment = full deck areaSynthetic if that's what the manufacturer requires
  • Ridge cap = hips + ridges LFNot cut from field shingles if the system calls for cap

Edges and underlayment

Flashing and penetrations

  • Step flashing at sidewallsIRC R905.2.8.3
  • Headwall / apron flashingIRC R903.2.1
  • Chimney flashing and counter-flashingIncluding cricket if over 30 in. wide
  • Pipe boots, every penetrationCount back slopes too
  • Roof vents, turbines, exhaust capsMatch the existing count
  • Ridge ventIf existing or required for ventilation

Labor charges

Job costs

  • PermitLocal fee
  • Dumpster / haul-offIf not included in tear-off
  • Overhead & profitCommonly owed with 3+ trades on the estimate
  • Gutters, screens, paintHail damage beyond the roof
  • Sales tax on materialsWhere the carrier left it off

getclaimgap.com · General information for contractors documenting their scope of work. Code adoption varies by jurisdiction.

Let ClaimGap run this checklist for you.

Upload a carrier estimate you already have, even one from a claim you closed. If ClaimGap finds nothing, you paid nothing.